Today training mostly talk about the system setting and communication with WiFi |
Products represent and distributor for eo charging, Ulica solar , Solis, Deye, Dyness, Western and inlux .
Monday, September 22, 2014
Sungrow inverter install by Refit
Friday, September 12, 2014
Malaysia FIT Solar quota 2015
SEDA will be releasing solar PV quota for the non-individuals for projects achieving commercial operation in 2015. The proposed maximum quota allocated for solar PV installed capacities of up to 425 kW is 20 MW whereas for solar PV installed capacities greater than 425 kW and up to 1 MW, the proposedmaximum is 34 MW. Eligible producers (interested applicants) are advised to be fully compliant in their submissions with the requirements and conduct the necessary connection confirmation check (CCC) or power systems study (PSS) before submitting their applications. The exact date of submission of applications will be announced by SEDA in Q4 2014.
Subscribe to:
Posts (Atom)
BOS Featured Post
-
Despite the fact that Monocrystalline solar panels, Polycrystalline solar panels, and Amorphous solar panels all feature silicon as it...
-
Trina Solar’s PV modules have commenced operations in a 455MW DC solar power plant in Andhra Pradesh developed by SB Energy, ...